![]() |
Coiled Tubing Module 1 |
Section |
Title |
Page Number |
![]() |
1 |
THE COILED TUBING WELL INTERVENTION METHOD |
1-1 |
|
1.1 |
DESCRIPTION OF THE COILED TUBING SERVICE |
1-1 |
|
1.2 |
THE COILED TUBING UNIT |
1-1 |
|
1.2.1 |
Power Pack |
1-3 |
|
1.2.2 |
Control Cabin |
1-5 |
|
1.2.3 |
Reel |
1-8 |
|
1.2.4 |
Injector Head |
1-10 |
|
1.3 |
GOOSE NECK |
1-15 |
|
Section |
Title |
Page Number |
![]() |
2 |
PLANNING AND SAFETY |
1-1 |
|
2.1 |
PRE-JOB PLANNING |
2-1 |
|
2.2 |
OPERATIONAL CONSIDERATIONS |
2-1 |
|
2.2.1 |
Gas Wells |
2-1 |
|
2.2.2 |
High Wellhead Pressures |
2-1 |
|
2.2.3 |
Toolstring Lengths |
2-1 |
|
2.2.4 |
Long BHA Deployments |
2-1 |
|
2.2.5 |
Deployment Considerations |
2-1 |
|
2.2.6 |
Rig Floor Equipment |
2-2 |
|
2.3 |
COILED TUBING EQUIPMENT CONSIDERATIONS |
2-2 |
|
2.3.1 |
Well Control Equipment |
2-2 |
|
2.3.2 |
Control Hoses |
2-2 |
|
2.3.3 |
Support Stand |
2-3 |
|
2.3.4 |
Tie-Back Points |
2-3 |
|
2.4 |
SAFETY CONSIDERATIONS |
2-3 |
|
2.4.1 |
General Safety Considerations |
2-3 |
|
2.4.2 |
Well Control Considerations |
2-4 |
|
2.4.3 |
Coiled Tubing Considerations |
2-5 |
|
2.5 |
RUNNING AND PULLING PROCEDURES |
2-5 |
|
2.5.1 |
Procedure |
2-5 |
|
2.5.2 |
Running/Pulling Procedural Guidelines |
2-7 |
|
2.6 |
EMERGENCY PROCEDURES |
2-8 |
|
2.6.1 |
Platform Shutdown |
2-8 |
|
2.6.2 |
Stripper/Packer Element Leak |
2-8 |
|
2.6.3 |
Leak Between Tree And BOPs |
2-8 |
|
2.6.4 |
Tubing Pinhole Leak |
2-9 |
|
2.6.5 |
Tubing Rupture |
2-9 |
|
2.6.6 |
Tubing Separates Downhole |
2-9 |
Section |
Title |
Page Number |
![]() |
3 |
PRESSURE CONTROL EQUIPMENT |
3-1 |
|
3.1 |
STRIPPER/PACKER |
3-1 |
|
3.1.1 |
Conventional Stripper |
3-2 |
|
3.1.2 |
Side Door Stripper |
3-2 |
|
3.1.3 |
Radial Stripper |
3-2 |
|
3.2 |
BOP |
3-7 |
|
3.3 |
SHEAR/SEAL |
3-11 |
|
3.4 |
PRESSURE CONTROL STACK-UP ARRANGEMENTS |
3-13 |
|
Section |
Title |
Page Number |
![]() |
4 |
DOWNHOLE TOOL SELECTION |
4-1 |
|
4.1 |
END CONNECTOR |
4-1 |
|
4.1.1 |
Roll-On End Connector |
4-1 |
|
4.1.2 |
Roll-On Double End Connector |
4-1 |
|
4.1.3 |
Crimping Tool |
4-3 |
|
4.1.4 |
Dimple Connector |
4-4 |
|
4.1.5 |
External Slip Connector |
4-5 |
|
4.1.6 |
Electric Wireline Connector |
4-6 |
|
4.2 |
CHECK VALVES |
4-7 |
|
4.2.1 |
Ball Check Valve |
4-7 |
|
4.2.2 |
Dart Check Valve |
4-8 |
|
4.2.3 |
Flapper Check Valve |
4-9 |
|
4.2.4 |
Spring Return Check Valve |
4-10 |
|
4.3 |
PRESSURE RETAINING CHECK VALVE |
4-11 |
|
4.4 |
RELEASE JOINTS |
4-12 |
|
4.4.1 |
Pressure Activated Release Joint |
4-13 |
|
4.4.2 |
Tension Activated Release Joint |
4-14 |
|
4.5 |
ANCILLIARY TOOLING |
4-15 |
|
4.6 |
TOOLSTRING CONFIGURATION |
4-21 |
|
4.6.1 |
Operation |
4-21 |
|
4.6.2 |
Limitations of Toolstring |
4-21 |
|
4.6.3 |
Wellbore Restrictions |
4-21 |
|
4.6.4 |
Wellbore Deviations/Severe Doglegs/Horizontal Sections |
4-21 |
|
4.6.5 |
Wellbore Fluids |
4-21 |
|
Section |
Title |
Page Number |
![]() |
5 |
COILED PIPE |
5-1 |
|
5.1 |
COILED PIPE MANUFACTURERS |
5-1 |
|
5.2 |
TUBING MANUFACTURING HISTORY |
5-2 |
|
5.3 |
TUBING MATERIALS |
5-3 |
|
5.4 |
MANUFACTURING PROCESS |
5-4 |
|
5.4.1 |
Standard Tube-to-Tube Weld |
5-4 |
|
5.4.2 |
Continuous Milled Coil Tubing |
5-5 |
|
5.4.3 |
Tubing Forming Rollers |
5-7 |
|
5.4.4 |
Tapered String Welding |
5-8 |
|
5.5 |
COILED TUBING APPLICATIONS |
5-9 |
|
5.5.1 |
Workover and Drilling Services |
5-9 |
|
5.5.2 |
Completions |
5-9 |
|
5.5.3 |
Flowlines |
5-9 |
|
5.6 |
FUTURE PIPE DEVELOPMENTS |
5-9 |
|
5.6.1 |
High Strength Materials |
5-9 |
|
5.6.2 |
Composite Materials |
5-10 |
|
5.7 |
COILED TUBING LIMITATIONS |
5-10 |
|
5.8 |
TUBING LIFE LIMITS |
5-11 |
|
5.8.1 |
Fatigue Due To Bending And Pressure |
5-12 |
|
5.8.2 |
Pressure And Tension Limits |
5-16 |
|
5.8.3 |
Diameter And Ovality Limits |
5-18 |
|
5.8.4 |
Coiled Tubing Buckling And Lockup |
5-18 |
|
5.8.5 |
Coiled Tubing Forces Model Parameters |
5-19 |
Section |
Title |
Page Number |
![]() |
6 |
COMPUTER SIMULATION AND MONITORING |
6-1 |
|
6.1 |
SOFTWARE TECHNOLOGY |
6-1 |
|
6.1.1 |
Model Features Of BUCKLE |
6-1 |
|
6.1.2 |
Model Features Of CDRAG |
6-2 |
|
6.1.3 |
Model Features Of CSTRESS |
6-2 |
|
6.1.4 |
Model Features Of TRIAX1 |
6-4 |
|
6.1.5 |
Model Features Of CEMENT |
6-4 |
|
6.1.6 |
Model Features Of HYDMOD |
6-5 |
|
6.1.7 |
Model Features Of PROMOD |
6-5 |
|
6.1.8 |
Model Features Of WELCON |
6-6 |
|
6.2 |
DATA ACQUISITION SYSTEMS |
6-7 |
|
Section |
Title |
Page Number |
![]() |
7 |
COILED TUBING APPLICATIONS |
7-1 |
|
7.1 |
GAS LIFTING |
7-1 |
|
7.1.1 |
Equipment Required |
7-2 |
|
7.1.2 |
Downhole Tools |
7-2 |
|
7.2 |
SAND CLEANOUT |
7-6 |
|
7.2.1 |
Sand Clean-out |
7-6 |
|
7.2.2 |
Equipment |
7-7 |
|
7.2.3 |
Downhole Tools |
7-7 |
|
7.3 |
ACID SPOTTING |
7-11 |
|
7.3.1 |
Acid Washing |
7-11 |
|
7.3.2 |
Equipment |
7-11 |
|
7.3.3 |
Downhole Tools |
7-11 |
|
7.4 |
CEMENTING |
7-16 |
|
7.4.1 |
Cementing |
7-16 |
|
7.4.2 |
Equipment |
7-16 |
|
7.4.3 |
Downhole Tools |
7-16 |
|
7.5 |
MILLING AND UNDER-REAMING |
7-24 |
|
7.5.1 |
Milling and Under-Reaming |
7-24 |
|
7.5.2 |
Equipment |
7-24 |
|
7.5.3 |
Downhole Tools |
7-24 |
|