Well Test Module 3 |
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
1 |
AIMS AND OBJECTIVES |
1.1 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
2 |
TYPICAL WELL TEST PLANNING MANUAL |
2.1 |
|
2.1 |
ABBREVIATIONS |
2.1 |
|
2.2 |
RIG MOVE MEETING |
2.3 |
|
2.3 |
PRE-SPUD MEETING |
2.3 |
|
2.4 |
RIGSITE SPUD MEETING |
2.5 |
|
2.5 |
PRE-TEST MEETING |
2.5 |
|
2.6 |
PRE-COMPLETION MEETING |
2.6 |
|
2.8 |
PRE-WORKOVER MEETING |
2.6 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
3 |
WELL TEST PLANNING |
3.1 |
|
3.1 |
INTRODUCTION |
3.1 |
|
3.2 |
INFORMATION AVAILABLE |
3.1 |
|
3.3 |
TEST OBJECTIVES |
3.2 |
|
3.4 |
TEST STRATEGY |
3.5 |
|
3.5 |
TEST DESIGN |
3.5 |
|
3.6 |
WELL DESIGN |
3.9 |
|
3.6.1 |
Casing Programme |
3.11 |
|
3.6.2 |
Drilling Fluids Programme |
3.13 |
|
3.6.3 |
Cement Programme |
3.15 |
|
3.6.4 |
Directional Programme |
3.17 |
|
3.6.5 |
General |
3.19 |
|
3.7 |
DRILLING PROGRAMME |
3.20 |
|
3.7.1 |
Drilling Fluids Programme |
3.21 |
|
3.7.2 |
Cement Programme |
3.21 |
|
3.7.3 |
Wellhead Manufacturer's Manuals |
3.21 |
|
3.7.4 |
Bit Proposal |
3.21 |
|
3.7.5 |
Directional Programme (If Applicable) |
3.21 |
|
3.7.6 |
Conductor and Casing Connection Information |
3.21 |
|
3.7.7 |
Specifications |
3.21 |
|
3.7.8 |
Tide Charts (If Applicable) |
3.21 |
|
3.7.9 |
Relevant Manuals |
3.22 |
|
3.7.10 |
Distribution List (Drilling Programme Only) |
3.22 |
|
3.8 |
WELL TEST OPERATIONS |
3.23 |
|
3.8.1 |
Sequence Of Action Events In Well Test Preparation |
3.25 |
|
3.9 |
CLIENT QUESTIONNAIRE |
3.29 |
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
4 |
RIG VISIT |
4.1 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
5 |
WELL TEST PROGRAM |
5.1 |
|
5.1 |
STATEMENT |
5.1 |
|
5.2 |
INTRODUCTION |
5.1 |
|
5.3 |
TEST OBJECTIVE |
5.1 |
|
5.4 |
WELL TESTING SAFETY PROCEDURES |
5.1 |
|
5.4.1 |
Rig Safety Meeting and Preparations |
5.1 |
|
5.4.2 |
Wireline Perforating |
5.3 |
|
5.4.3 |
Testing The Well |
5.3 |
|
5.4.4 |
Responsibilities |
5.4 |
|
5.4.5 |
Contingency Measures |
5.5 |
|
5.4.6 |
Hydrogen Sulfide (H2S) |
5.6 |
|
5.4.7 |
Deteriorating Weather |
5.6 |
|
5.5 |
TEST DESIGN |
5.6 |
|
5.5.1 |
Well and Reservoir Data |
5.6 |
|
5.5.2 |
Test Program Outline |
5.7 |
|
5.6 |
WELL TEST REQUIREMENT |
5.7 |
|
5.6.1 |
Well Preparation Prior to Testing |
5.7 |
|
5.6.2 |
Testing Equipment |
5.8 |
|
5.7 |
PERFORATION |
5.9 |
|
5.7.1 |
Tubing Conveyed Perforation |
5.9 |
|
5.7.2 |
Cushion |
5.10 |
|
5.7.3 |
Completion Fluid |
5.10 |
|
5.7.4 |
Sampling and Contaminant Analysis |
5.10 |
|
5.7.5 |
Data Acquisition |
5.11 |
|
5.7.6 |
Production Logging |
5.12 |
|
5.8 |
TESTING PREPARATION |
5.13 |
|
5.9 |
SEQUENCE OF OPERATIONS |
5.14 |
|
5.9.1 |
Well Preparation |
5.14 |
|
5.9.2 |
Running Test String |
5.14 |
|
5.9.3 |
Depth Correlation |
5.15 |
|
5.9.4 |
Surface Line Rig-up |
5.16 |
|
5.9.5 |
Perforating |
5.16 |
|
5.9.6 |
Well Killing |
5.19 |
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
6 |
THE ROLE OF THE WELL TEST SUPERVISOR |
6.1 |
|
6.1 |
DRILLING COMPLETIONS AND WORKOVER MANAGER |
6.2 |
|
6.2 |
DRILLING SUPERINTENDENT |
6.3 |
|
6.3 |
SENIOR DRILLING ENGINEER |
6.4 |
|
6.4 |
FLUIDS ENGINEER |
6.5 |
|
6.5 |
DRILLING ENGINEER |
6.6 |
|
6.6 |
COMPLETION AND WORKOVER SUPERINTENDENT |
6.6 |
|
6.7 |
SENIOR COMPLETION ENGINEER |
6.7 |
|
6.8 |
JUNIOR COMPLETION ENGINEER |
6.8 |
|
6.9 |
THE ROLE OF OTHER PERSONNEL |
6.9 |
|
6.10 |
PRE-TEST MEETINGS |
6.11 |
|
6.11 |
SAFETY MEETINGS |
6.12 |
|
6.12 |
SAFETY NOTES |
6.13 |
|
6.13 |
TOOLBOX TALKS |
6.14 |
|
6.14 |
FAULT RESPONSE |
6.19 |
|
6.15 |
LANDING STRING SPACE-OUT |
6.21 |
|
6.16 |
SPACE OUT PERMANENT PACKER DST |
6.24 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
7 |
SURFACE EQUIPMENT LAYOUT |
7.1 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
8 |
AREA CLASSIFICATION |
8.1 |
|
8.1 |
HAZARDOUS ATMOSPHERE |
8.1 |
|
8.2 |
HAZARDOUS AREA |
8.1 |
|
8.3 |
ZONE 1 - AREAS |
8.1 |
|
8.4 |
ZONE 2 - AREAS |
8.2 |
|
8.5 |
VERTICAL EXTENT OF ZONE 1 AND ZONE 2 AREAS |
8.2 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
9 |
PRESSURE TESTING |
9.1 |
|
9.1 |
PRECAUTIONS PRIOR TO HYDRAULIC PRESSURE TESTING |
9.1 |
|
9.2 |
PRECAUTIONS FOR HYDRAULIC TESTING |
9.1 |
|
9.3 |
MEASUREMENTS WHILE TESTING |
9.3 |
|
9.4 |
MONITORING OF SURFACE MEASUREMENTS DURING TESTING |
9.5 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
10 |
QUICK CALCULATIONS |
10.1 |
|
10.1 |
HYDROSTATIC PRESSURE - LIQUIDS |
10.1 |
|
10.2 |
HYDROSTATIC PRESSURE – GASES |
10.2 |
|
10.3 |
FLOW OF DRY GAS THROUGH A CHOKE |
10.3 |
|
10.4 |
MULTIPHASE FLOW THROUGH A CHOKE |
10.4 |
|
10.5 |
FORMULAS FOR CALCULATING CAPACITY OF VERTICAL CYLINDRICAL TANKS WITH FLAT ENDS |
10.5 |
|
10.6 |
TEMPERATURE CONVERSIONS |
10.6 |
|
10.7 |
DECIMAL EQUIVALENTS OF FRACTIONS OF AN INCH IN INCHES AND MILLIMETRES |
10.7 |
|
10.8 |
CAPACITY OF VERTICAL CYLINDRICAL TANKS |
10.8 |
|
10.9 |
TABLE AND EXAMPLE OF THE CALCULATION OF THE VOLUME OF FLUID IN A HORIZONTAL CYLINDRICAL TANK WITH FLAT ENDS |
10.10 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
11 |
WELL TEST REPORT |
11.1 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
12 |
PRESSURE BASICS |
12.1 |
|
12.1 |
FUNDAMENTALS OF FLUIDS AND PRESSURE |
12.1 |
|
12.1.1 |
Fluid Pressure |
12.1 |
|
12.1.2 |
Specific Gravity |
12.3 |
|
12.1.3 |
API Gravity |
12.3 |
|
12.1.4 |
Hydrostatic Pressure |
12.4 |
|
12.1.5 |
Gas Correction Factors |
12.6 |
|
12.2 |
FORMATION PRESSURE |
12.10 |
|
12.2.1 |
Sub-normal Formation Pressure |
12.10 |
|
12.2.2 |
Normal Formation Pressure |
12.11 |
|
12.2.3 |
Abnormal pressure |
12.11 |
|
12.2.4 |
Reservoir Structure |
12.14 |
|
12.3 |
FORMATION FRACTURE PRESSURE |
12.15 |
|
12.4 |
FORMATION INTEGRITY TESTS |
12.16 |
|
12.5 |
MAXIMUM ALLOWABLE ANNULUS SURFACE PRESSURE - MAASP |
12.18 |
|
12.6 |
CIRCULATING PRESSURE LOSSES |
12.19 |
|
Section |
Title |
Page Number |
This is a planning/procedural manual, and as such, it requires no graphics |
13 |
PRODUCTION WELL KILL PROCEDURES |
13.1 |
|
13.1.1 |
Bullheading (or Squeeze Kill) |
13.4 |
|
13.1.2 |
Lubricate and Bleed |
13.6 |
|